iTWO References

iTWO Case Studies:

The Site Manager of the Virtual Model - b.i.m.m. GmbH 

"I have always felt that working with the most modern and innovative IT solutions the market has to offer is a sound basis for success in the construction industry. RIB's new iTWO software system is definitely in this league. The career I have had so far proves that my intuition was correct." more


Model-Based Engineering and Construction Processes Efficiently Implemented in Real Estate Projects - Kraneis Bauingenieure

"By reducing the workload in costing and quantity takeoff, compilation of works specifications, invoicing, and preparing tenders, the integrated solution consisting of RIB iTWO and Autodesk Revit saves about 50% of my time."  more


The Future of the Construction Industry is Based on 5D Construction Models - Ingenieurbüro Pinkert

According to Dieter Pinkert, engineering companies can save even more, as “more planning accuracy means less deviation from the actual construction. We can save 20 to 25 percent of planning and engineering costs using the model-based method. This savings potential alone shows why the future belongs to 5D and why there is no alternative.''  more


Starting Out Into the Future

Max Bögl is implementing a company-wide switchover from the predecessor system ARRIBA to the new technology associated with RIB iTWO at the end of 2010. The company plans to go live with iTWO in January 2011. East European branches of the company, particularly in the Czech Republic and Poland, are to follow. more


“We intend to further develop our market leaderships positions with iTWO,“ says Hannes Truntschnig, responsible Managing Director of STRABAG SE. “The integrated technical ERP solution of RIB Software AG links up all construction and business processes, optimises our controlling of construction schedules and costs, and beyond that, fully supports the communication among our staff and the exchange of information with customers and subcontractors. This way we enhance the value added of our team collaboration.”

 Hannes Truntschnig, Managing Director STRABAG SE


"We are convinced that the integrated support of model-based work processes offered by iTWO will help us to significantly improve our competitiveness. So far there was no 5D software anywhere in the world specifically for the construction industry that we could use for end-to-end sustained support of our processes. In iTWO we have now found an integrated solution that meets all our requirements of model-based project management software. In particular, the certified integration with SAP ERP enables transparent project and business control with all the relevant data available online."

Wolgang Herrmann, Max Bögl


"We expect RIB iTWO to give us substantially greater flexibility in project processing, particularly in the case of design changes in the planning and quotation phase, and believe this will enable us to react more quickly and accurately to our customers’ wishes. The 3D model will therefore save us time and money. The visualisation of projects will also allow us to detect sources of error at an early stage and thus minimise risks. On the construction side, we expect to be able to communicate the nature of the planned projects more efficiently to our project partners by using the software’s intelligent visualisation techniques. This has not been possible with products available on the market before now."

 Detlev Lubasch,  Bilfinger Berger Nigeria GmbH


Using iTWO, we reduced our project lead times very quickly, so that we are noticing the first signs of success already,” reports Salzer. “By adopting the digital work method, we have accelerated the quantity takeoff process for carcassing work by roughly 50 per cent.

Andreas Salzer, Head of Organisation WOLFF & MÜLLER


“The 5D construction model enables us to predict 1:1 how the process will work on the construction site. Our 5D representation of construction site activity is so transparent that the price calculation for the construction company is realistic. That means a totally new type of cost estimation basis for the contractor. I have always felt that working with the most modern and innovative IT solutions the market has to offer is a sound basis for success in the construction industry. RIB’s new iTWO software system is definitely in this league.”    

Anton Gasteiger, general manger b.i.m.m. GmbH


“By reducing the workload in costing and quantity takeoff, compilation of works specifications, invoicing, and preparing tenders, the integrated solution consisting of RIB iTWO and Autodesk Revit saves about 50% of my time. And time is money in the construction industry, as everybody knows. There will soon be no alternative, as customer expectations are increasing all the time. This is not only the case for extremely large construction projects, which means that an integrated technical ERP system like iTWO Business Suite is essential for large construction companies. They want to see why something on the construction site is not working so that they can take appropriate action if necessary.”    

Detlev Kraneis, Kraneis Bauingenieure


“There is a continuous and massive increase in customer expectations. That’s why construction with 5D models will establish itself as standard practice. More planning accuracy means less deviation from the actual construction. We can save 20 to 25 percent of planning and engineering costs using the model-based method. This savings potential alone shows why the future belongs to 5D and why there is no alternative.” Dieter Pinkert, Manager of Pinkert engineering company.  

Dieter Pinkert, Ingenieurbüro Pinkert


“The manufacturing and automobile industries managed to cut costs by 30% using the new technology. We anticipate savings of up to 15% within the next six months. In the German construction industry in particular, software systems of RIB have an established reputation. All over the country, more and more companies are switching over from alphanumeric RIB CSuite software to iTWO. It makes sense for engineers, especially small and medium-sized engineering companies, to go the same way as medium and large construction companies with a view to full integration and therefore economic efficiency. Today and in future.“  

Claus Radl, Managing Director Radl Engineering




Social Bookmark: